Six Sigma Keys to Lean Maintenance
EP Editorial Staff | November 1, 2004
How the Y = f(x) thought process can lead the way to lean maintenance reliability
Too many times in lean manufacturing and other lean environments, 10-40 year old equipment is redeployed, moved, and organized into lean cells without adequate concern or attention to maintenance reliability. In a lean cell, unscheduled equipment downtime usually costs 10-20 times what the same equipment downtime costs in a traditional batch processing or functional department.
For example, before lean, CNC machine tool downtime may have been $250–$750 per hr for a single 3-5 axis machine or robot. Now, automakers who have well-configured lean manufacturing plants cite machine tool or robot downtime costs of $2500-$5000 per hr unless the robot misses painting a car. Then the factory is backed up and downtime cost jumps to $3350 per min.
As a maintenance engineer for John Deere Co. in the 1970s, this writer was highly motivated by downtime figures of $250-$750 per hr—motivated to find ways to avoid, reduce, or eliminate downtime wherever possible. How much more motivating is lean maintenance reliability today?
Six Sigma for increased uptime
The answer to increased reliability and uptime of computers, telecom equipment, machine tools, automation controls, hydraulic systems, electronics, etc., used in lean manufacturing and other lean environments can be derived from Six Sigma’s Y = f(x) and DMAIC. That is as long as the wrong (apparent) path is not followed, as explained below.
Before Six Sigma, analysis began by gathering “cause,” “effect,” and “result” information on each maintenance downtime situation. For example:
Cause—Bad CAU2 circuit board
Effect—X-Y axis cutting egg shapes rather than circles
Result—Scrap parts, downtime
Log books with this format were placed at each machine. Each machine maintenance situation was detailed by the electrician or mechanic as soon as the machine was repaired and the cause was known and corrected.
Soon the analysis database looked something like Table 1.
As this history table of malfunctions and failures is examined, there is little commonality in cause but great commonality in result. Even the effect is often similar from dissimilar causes.
Six Sigma improvement methods would express these malfunctions and failures in terms of Y = f(x) where Y is the malfunction, error, or defect which results from a function of x. Using this approach, three possibilities are apparent:
• Y as the effect and (x) as the cause
• Y as the result and (x) as the effect
• Y as the result and (x) as the cause
It seemed important to focus on the third approach using the result (Y) and the cause (x) to try and reduce Y (downtime, scrap, and rework). More recent years of experience also show that eliminating or reducing Y also results in increased precision, repeatability, and yield for semiconductor and nanotechnology fabrication and other process industries.
The problem is there does not seem to be much commonality in the cause (x) factors as is expected by Six Sigma methodology. This would normally suggest the need for a more elaborate, expensive, and time-consuming predictive maintenance program. With enough tracking, mean time between failure (MTBF) should be able to be calculated and a prediction made as to when these devices and components are about to fail so they can be replaced before they fail.
Identify stresses
At John Deere, this was the apparent path when a single downtime situation, caused by a failed axis drive board, shocked this writer into a huge paradigm shift. It was written into the log book:
Cause—Bad axis drive board
Effect—X axis oscillation
Result—Scrap, downtime
But the simple observation was made, “No wonder the board failed, it’s too hot in that cabinet!”. There was a “cause of the cause.” It was instantly clear that heat stress was causing much of the higher downtime experienced every summer with this vintage of CNC lathe and the stress for each downtime situation in our log books should have been identified:
Heat—Caused—Bad axis drive board
Effect—X axis oscillation
Result—Scrap, downtime
And what are the other stresses that cause electronic, hydraulic, and automation equipment downtime? In this instance the (x) factor was heat. Y (scrap and downtime) was happening as a function of (x), heat.
What are the other basic stresses that cause these seemingly random malfunctions, failures, and downtime? That very day, brainstorming identified these stresses: heat; vibration; dirt buildup; oxidation; corrosion; power surges, lightning storm transients, etc.; and hydraulic contamination.
The first efforts to eliminate heat by adding a cabinet air conditioner proved so effective that the focus moved completely away from predictive maintenance to stress elimination to prolong rather than predict MTBF. Eliminating a stress or hardening equipment against stress resulted in such an increase in MTBF that there was little sense in predicting failure when we were still finding ways to prevent the failure, prolong reliability, and increase uptime.
Now our maintenance history table looked like Table 2.
In Six Sigma terms, (x) had been identified. Of course not all seven (x) factors are present and active on any given computer, machine, or piece of equipment. But, in the 25 years since that discovery, I have not been able to add to that list of basic stresses. Sometimes there are other key issues, such as poor design, operator abuse, or inadequate component ratings, but even these can frequently be endured and downtime avoided by eliminating the related stress.
Eliminate stresses
Now the question is what are the most cost-effective ways to eliminate these stresses. Or, how can equipment be protected against the unavoidable presence of these stresses? Possibly the most effective way to make sure these questions get answered and acted upon is to use Six Sigma and its DMAIC model:
• Define the problem
• Measure the problem
• Analyze how the problem can be eliminated
• Implement the solution, and
• Control the solution to ensure it continues and is improved if practical (kaizen).
At John Deere’s Dubuque Works, 2 years of analyzing and implementing solutions resulted in cutting unscheduled maintenance downtime by 50-60 percent.
Future articles will discuss these seven chronic stresses to keep production moving with lean reliability. MT
Howard C. Cooper is founder of AMEMCO, P.O. Box 211, Kaysville, UT 84037; (801) 859-2073
Table 1. Maintenance history of malfunctions and failures
Cause |
Effect |
Result |
|
CAU2 board |
Egg shaped cuts |
Scrap, downtime |
|
Bad memory board |
Part ID growing |
Rework, downtime |
|
Axis drive board |
Axis oscillation |
Scrap, downtime |
|
Spindle CMD board |
RPM swings |
Rework, downtime |
|
Servo valve |
Y run to limit |
Downtime |
|
Bad solenoid |
No coolant |
Downtime |
|
Hydraulic pump |
No chuck gripping |
Scrap, downtime |
|
Hydraulic 3W valve |
Turret unclamping |
Broken tool holder |
|
SCR failed |
Z axis runaway |
Downtime |
|
CMD board |
No X movement |
Downtime |
|
FE-2A board |
Only rapid travel |
Broken tool, scrap, downtime |
|
Z-PWM drive |
A axis not stopping |
Scrap, downtime |
|
Bad limit switch |
X axis crash |
Rework, downtime |
|
Bad encoder |
Positioning errors |
Scrap, rework, downtime |
|
Loose FB connector |
Y axis run-away |
Rework, downtime |
|
Cap. on Y FB board |
No Z axis movement |
Scrap, downtime |
Table 2. Maintenance history with stresses identified
|
Effect |
Result |
|
Heat Caused |
|
|
|
CAU2 board |
Egg shaped cuts |
Scrap, downtime |
|
Bad memory board |
Part ID growing |
Rework, downtime |
|
Axis drive board |
Axis oscillation |
Scrap, downtime |
|
Spindle CMD board |
RPM swings |
Rework, downtime |
|
Contamination Caused |
|
|
|
Servo valve |
Y run to limit |
Downtime |
|
Bad solenoid |
No coolant |
Downtime |
|
Hydraulic pump |
No chuck gripping |
Scrap, downtime |
|
Hydraulic 3W valve |
Turret unclamping |
Broken tool holder |
|
Surges Caused |
|
|
|
SCR failed |
Z axis runaway |
Downtime |
|
CMD board |
No X movement |
Downtime |
|
FE-2A board |
Only rapid travel |
Broken tool, scrap, downtime |
|
Z-PWM drive |
A axis not stopping |
Scrap, downtime |
|
Vibration Caused |
|
|
|
Bad limit switch |
X axis crash |
Rework, downtime |
|
Bad encoder |
Positioning errors |
Scrap, rework, downtime |
|
Loose FB connector |
Y axis run-away |
Rework, downtime |
|
Cap. on Y FB board |
No Z axis movement |
Scrap, downtime |